The motorcycle platform stops 65 cm below the top of the structure, so in case of structure height 225 - 65 = 160 cm. In case of 340 cm height structure stops at 275 cm height.

The entire top of the motorcycle potentially reaches higher than the height of the structure. When lifting, care must be taken to ensure that the vehicle does not collide with the ceiling or any other neighboring structures.

Yes, it is possible.

Generally speaking, considering a 2000s motocross/enduro bikes/motorcycles and taking advantage of the full height, the third bike remains raised about 2 inches, as per the attached drawings:

STRUCTURE H = 340 cm

STRUCTURE H = 225 cm

The product is delivered on europallets, each component will have a separate package.

The package has a significant weight, so it is necessary for a person to be present at the unloading, to open the package and transport the various pieces within the property, Generally, the transporter will unload the pallet via roadside hydraulic tailgate, but does not have a pallet truck to move the goods.

Yes, it is possible. To learn more and check the feasibility contact us here: info@levada.bike

There are two heights: 340 cm and 225 cm. It is possible to study custom heights for special projects. For ad hoc measures contact us here: info@levada.bike

The certified steel ropes are available in three lengths, 100 cm, 120 cm, 70 cm. They are sold together with the main accessories and are designed to optimize the space between them. For ad hoc measures contact us here: info@levada.bike

The system is on prompt delivery, preparation is generally done in one day. Shipping with BRT takes about two days for the Italian market and a few more days for the rest of Europe. We ship only with primary couriers and with shipment tracking.

The maximum total liftable weight is 400kg.

About 75 percent of the weight is discharged to the ground via the main column and its support foot. The remaining 25% of the weight (about 100kg) is retained by the wall mounting brackets.

Each fixing bracket is arranged to receive 8 dowels, for a grand total of 32 dowels. Normally, 6-8 anchors (two per bracket) are sufficient to firmly anchor the structure to the supporting wall.

When fixing the structure to the wall, strictly follow the instructions given in the instruction manual that can be downloaded here: Downloads - Levada

The kit consists of two quick connectors that allow the hand control to be detached. Without the hand control, the winch will not work, as the capacitor for the cue is built into the hand control itself. It allows the electrical descent of lifted products to be made almost impossible and acts as an additional security measure against any ill-intentioned persons.

A 70-cm-long cable with a Shuko plug comes out of the winch, attached to the top of the structure. An extension cord can possibly be run inside the column if the power supply was in the lower part of the room.